Prince Ali Hospital – Karak
Menu
Project Information
Sector: Hospitals & Clinics
Location: Karak – Jordan
Designer: Arabtech Jardaneh
Client: Ministry of Public Works & Housing
Completed: 2003
Hospital infrastructure works, including;
Re-check design and preparing shop drawings and execute all mechanical works as follow:
- Dismantling all old systems in the hospital and replaced with new system.
- Refurbishment and renovation of the hospitals infrastructure mechanical works, external sewerage network and steam boilers.
- Pumps
- Hot water system
- Domestic hot/cold water system
- Sewerage & pumps networks
- Wastewater treatment (Crease interceptor)
- Steam network
- Softener system and all accessories and network related.
- Renovation of kitchen equipment, cold rooms and faucets.
- Renovation of electrical works infrastructure of site and associated building as well as installing and commissioning of new power generator.
- Installation all electrical work for new mechanical equipment
- Installation power and low current system
- Renovation of laundry equipment
- Automated control system
- Motor control center
- Construction management and planning for all projects works.
- Fire fighting system, FM-200 & Co2 system.