Prince Ali Hospital – Karak

Project Information

 

Sector:                  Hospitals & Clinics

Location:                Karak – Jordan

Designer:              Arabtech Jardaneh

Client:                      Ministry of Public Works & Housing

Completed:            2003

Hospital infrastructure works, including;

Re-check design and preparing shop drawings and execute all mechanical works as follow:

  1. Dismantling all old systems in the hospital and replaced with new system.
  2. Refurbishment and renovation of the hospitals infrastructure mechanical works, external sewerage network and steam boilers.
    • Pumps
    • Hot water system
    • Domestic hot/cold water system
    • Sewerage & pumps networks
    • Wastewater treatment (Crease interceptor)
    • Steam network
    • Softener system and all accessories and network related.
  3. Renovation of kitchen equipment, cold rooms and faucets.
  4. Renovation of electrical works infrastructure of site and associated building as well as installing and commissioning of new power generator.
    • Installation all electrical work for new mechanical equipment
    • Installation power and low current system
  5. Renovation of laundry equipment
  6. Automated control system
  7. Motor control center
  8. Construction management and planning for all projects works.
  9. Fire fighting system, FM-200 & Co2 system.